Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Moderator: Moderators
Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
I've read this on various sites- nothing concrete from Disney though- that Test Track is supposed to be going down for a major overhaul with a possible retheming in 2012, starting in either January or April. I read on more than one site the date pinpointed is 9 January 2012 but like I said, Disney has not clarified. Here's one of the sites-
http://www.epcyclopedia.com/2011/09/15/ ... l-retheme/
It'd be nice if it did happen, the ride is in serious need of some adjustments and updating.
http://www.epcyclopedia.com/2011/09/15/ ... l-retheme/
It'd be nice if it did happen, the ride is in serious need of some adjustments and updating.
-
- Submarine Voyage Captain
- Posts: 10954
- Joined: Sep Sun 06, 2009 8:53 am
- Location: 76 Totters Lane
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Be honest, with CARS land under construction at DCA, I have had a fear they would re-do TEST TRACK to be the "World of Motion with PIXAR's CARS" (like they did "The Living Seas with Nemo and Friends")...
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
I certainly hope not... I'd almost prefer to go back to World of Motion but we all know that isn't going to happen. I really could take or leave Test Track, honestly. I don't ride it too often mostly because of the idiots who take advantage of the single rider line.
-
- Pirates of the Caribbean Buccaneer
- Posts: 5531
- Joined: Sep Sat 04, 2010 1:44 pm
- Location: Southern California
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
We have seen new car bodies on the track, more modern, but it hasn't shown any signs of the lengthy (and expensive) pixar theme update, which makes sense if a car maker is still footing the bill.
That and pixar/characters are usually only added to existing rides that don't draw in crowds, such as the living seas.
That and pixar/characters are usually only added to existing rides that don't draw in crowds, such as the living seas.
-
- Submarine Voyage Captain
- Posts: 10954
- Joined: Sep Sun 06, 2009 8:53 am
- Location: 76 Totters Lane
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Actually, I think that backfired as far as the Living Seas goes...Wizzard419 wrote:We have seen new car bodies on the track, more modern, but it hasn't shown any signs of the lengthy (and expensive) pixar theme update, which makes sense if a car maker is still footing the bill.
That and pixar/characters are usually only added to existing rides that don't draw in crowds, such as the living seas.
-
- Submarine Voyage Captain
- Posts: 18543
- Joined: Dec Wed 12, 2007 1:41 pm
- Location: the flooded, flooded mitten
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Yeah, I don't know that Nemo draws anyone in more than the hydrolator did...although everyone seems to love the Mine - mine- mine seagulls out front quite a lot!mindflipper wrote:Actually, I think that backfired as far as the Living Seas goes...Wizzard419 wrote:We have seen new car bodies on the track, more modern, but it hasn't shown any signs of the lengthy (and expensive) pixar theme update, which makes sense if a car maker is still footing the bill.
That and pixar/characters are usually only added to existing rides that don't draw in crowds, such as the living seas.
-
- Submarine Voyage Captain
- Posts: 6740
- Joined: Mar Sat 29, 2008 8:04 pm
- Location: New Jersey
- Contact:
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
I'm thinking this is a major modernization of the attraction as everything in it is very dated. The refurbished cars that have popped up on the track are a nice little hint IMO of a major refurbishment that is planned.
- Len90
"If you can dream it, you can do it. Always remember that this whole thing was started with a dream and a mouse."
"Here you leave today and enter the world of yesterday, tomorrow, and fantasy"
"If you can dream it, you can do it. Always remember that this whole thing was started with a dream and a mouse."
"Here you leave today and enter the world of yesterday, tomorrow, and fantasy"
-
- Submarine Voyage Captain
- Posts: 18543
- Joined: Dec Wed 12, 2007 1:41 pm
- Location: the flooded, flooded mitten
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Do you know if they are running the refurbished cars all the time?Len90 wrote:I'm thinking this is a major modernization of the attraction as everything in it is very dated. The refurbished cars that have popped up on the track are a nice little hint IMO of a major refurbishment that is planned.
-
- Pirates of the Caribbean Buccaneer
- Posts: 5531
- Joined: Sep Sat 04, 2010 1:44 pm
- Location: Southern California
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
I didn't say it works, I only said they do it to try and fix rides that aren't getting people in the gate.mindflipper wrote:Actually, I think that backfired as far as the Living Seas goes...Wizzard419 wrote:We have seen new car bodies on the track, more modern, but it hasn't shown any signs of the lengthy (and expensive) pixar theme update, which makes sense if a car maker is still footing the bill.
That and pixar/characters are usually only added to existing rides that don't draw in crowds, such as the living seas.
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Test Track will be going down for refurb in April next yer. No it will not be a Cars overlay (thankfully!!!).
We are all a little weird
And life's a little weird,
And when we find someone whose
Weirdness is compatible with ours,
We join up with them and fall in
Mutual weirdness and call it Love.”
― Dr. Seuss
Eames: Listen, if you're gonna perform INCEPTION, you need IMAGINATION.
And life's a little weird,
And when we find someone whose
Weirdness is compatible with ours,
We join up with them and fall in
Mutual weirdness and call it Love.”
― Dr. Seuss
Eames: Listen, if you're gonna perform INCEPTION, you need IMAGINATION.
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
On a daily basis.Amy wrote:Do you know if they are running the refurbished cars all the time?Len90 wrote:I'm thinking this is a major modernization of the attraction as everything in it is very dated. The refurbished cars that have popped up on the track are a nice little hint IMO of a major refurbishment that is planned.
We are all a little weird
And life's a little weird,
And when we find someone whose
Weirdness is compatible with ours,
We join up with them and fall in
Mutual weirdness and call it Love.”
― Dr. Seuss
Eames: Listen, if you're gonna perform INCEPTION, you need IMAGINATION.
And life's a little weird,
And when we find someone whose
Weirdness is compatible with ours,
We join up with them and fall in
Mutual weirdness and call it Love.”
― Dr. Seuss
Eames: Listen, if you're gonna perform INCEPTION, you need IMAGINATION.
-
- Submarine Voyage Captain
- Posts: 6740
- Joined: Mar Sat 29, 2008 8:04 pm
- Location: New Jersey
- Contact:
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
When I was there they only had one refurbished car and it was not running. It all probably depends on the rotation. However, as more cars get done their sightings will become more frequent.
- Len90
"If you can dream it, you can do it. Always remember that this whole thing was started with a dream and a mouse."
"Here you leave today and enter the world of yesterday, tomorrow, and fantasy"
"If you can dream it, you can do it. Always remember that this whole thing was started with a dream and a mouse."
"Here you leave today and enter the world of yesterday, tomorrow, and fantasy"
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Thank goodness for that, a Cars theme would just be overkill.MadEye wrote:Test Track will be going down for refurb in April next yer. No it will not be a Cars overlay (thankfully!!!).
-
- Pirates of the Caribbean Buccaneer
- Posts: 5531
- Joined: Sep Sat 04, 2010 1:44 pm
- Location: Southern California
Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
Yeah, that would be terrible if Disney used a franchise with wide market appeal. 

Re: Test Track Refurb in 2012 Rumour- Anyone Heard For Sure?
While I have always argues that Test Track should have become a TRON ride, a refurbishment in the coming year will do. That ride really needs an overhaul.