The concrete work is still under way on Main Street USA. Here are some pictures that were taken the other day:
My WDW Trip Report March 2013
"I don't want to be a product of my environment. I want my environment to be a product of me"
"I don't want to be a product of my environment. I want my environment to be a product of me"
-
- Submarine Voyage Captain
- Posts: 18542
- Joined: Dec Wed 12, 2007 1:41 pm
- Location: the flooded, flooded mitten
Re: Main Street Concrete Replacement
Sorta surprising they aren't using higher walls so you can't see behind them...
-
- Pack Mules Wrangler
- Posts: 5143
- Joined: Sep Sun 02, 2007 3:27 pm
- Location: Valparaiso IN
Re: Main Street Concrete Replacement
Wow! That is messy looking!!! Glad it will be finished when we get there!
-
- Pirates of the Caribbean Buccaneer
- Posts: 5531
- Joined: Sep Sat 04, 2010 1:44 pm
- Location: Southern California
Re: Main Street Concrete Replacement
The low walls are pretty par for the course for stuff like that, though that looks more like they are doing paint work since there are drop cloths.
-
- Tom Sawyer Island Rafts Skipper
- Posts: 2744
- Joined: Apr Mon 28, 2008 7:31 pm
Re: Main Street Concrete Replacement
yeah that is definitely paint work...I guess touching up from any scuffs after doing the concrete work
1986: Offsite
1997: Offsite
2001: Coronado Springs
2008: Shades of Green / Saratoga Springs (WDW Half Marathon)
2009: Port Orleans French Quarter (WDW Half Marathon)
2010: Port Orleans Riverside (Honeymoon)
2011: Old Key West / Bay Lake Tower
2014: Kidani Village
2015: Old Key West (5th Wedding Anniversary)
2016: Old Key West (Kids' first WDW vacation in December!)
-
- Peter Pan's Flight Pixie Duster
- Posts: 484
- Joined: Jun Mon 10, 2013 11:40 pm
- Location: 817
Re: Main Street Concrete Replacement
Some pictures have been posted online about the progress of the concrete replacement at Main Street USA. Check them out:
My WDW Trip Report March 2013
"I don't want to be a product of my environment. I want my environment to be a product of me"
"I don't want to be a product of my environment. I want my environment to be a product of me"
-
- Snow White's Adventures Gem Miner
- Posts: 839
- Joined: Oct Wed 26, 2011 10:00 am
- Location: Brava Centauri
Re: Main Street Concrete Replacement
i was about to say... it is just the sidewalks being redone, as the street itself is slurry... but you can plainly see that by the pictures
-
- Peter Pan's Flight Pixie Duster
- Posts: 484
- Joined: Jun Mon 10, 2013 11:40 pm
- Location: 817
Re: Main Street Concrete Replacement
The curb at emporium is now finished and the work has now moved across the street:
My WDW Trip Report March 2013
"I don't want to be a product of my environment. I want my environment to be a product of me"
"I don't want to be a product of my environment. I want my environment to be a product of me"
-
- Davy Crockett's Explorer Canoes Guide
- Posts: 1038
- Joined: Sep Thu 25, 2008 8:44 am
Re: Main Street Concrete Replacement
Since we go to WDW a lot (Florida residents), I don't see this as a problem. However, I feel really bad for the first time visitor or someone who hasn't been in a long time. The walls and construction (destruction) would be a great disappointment and might give some people the wrong impression of our beautiful Main Street! (just sayin'..... )
-
- Pirates of the Caribbean Buccaneer
- Posts: 5531
- Joined: Sep Sat 04, 2010 1:44 pm
- Location: Southern California
Re: Main Street Concrete Replacement
That is why they do it in the off season (and only during the high season when it is totally critical). If they could do it all overnight, which is when they do most of the work, and have it ready in the morning they totally would.
-
- Storybookland Canal Boats Mate
- Posts: 2004
- Joined: Sep Tue 18, 2007 11:47 pm
- Location: Coral Springs, Fl
Re: Main Street Concrete Replacement
If that's the theory then January right after the Marathon would be the best down time, not during MNSSHP, lol
"hold on to them hats and glasses, cause this here's the wildest ride in the wilderness!!"
-
- Pirates of the Caribbean Buccaneer
- Posts: 5531
- Joined: Sep Sat 04, 2010 1:44 pm
- Location: Southern California
Re: Main Street Concrete Replacement
The work would need to be done prior to the holiday overlay (mid November) since it has to not only be tourist ready for the holidays, but also TV ready for the Christmas day parade filming which may start as early as November. So a few guests are impacted, but it could be much worse.
-
- Peter Pan's Flight Pixie Duster
- Posts: 484
- Joined: Jun Mon 10, 2013 11:40 pm
- Location: 817
Re: Main Street Concrete Replacement
Well today is the first day that the parades are affected by the concrete work. From today through the 4th, the parades will bypass the town square loop and head straight up to Main Street USA from the gate next to city hall. It seems like there is more concrete construction going on in the square besides the sidewalk replacement.
My WDW Trip Report March 2013
"I don't want to be a product of my environment. I want my environment to be a product of me"
"I don't want to be a product of my environment. I want my environment to be a product of me"
-
- Mad Tea Party Host
- Posts: 271
- Joined: Jul Fri 21, 2006 2:00 pm
- Location: Illinois but still an Iowa Hawkeye girl!!
Re: Main Street Concrete Replacement
Great, I had no idea all of this was going on. Sounds like it may be continuing while we are there in 5 weeks I bet.
-
- Davy Crockett's Explorer Canoes Guide
- Posts: 1038
- Joined: Sep Thu 25, 2008 8:44 am
Re: Main Street Concrete Replacement
Does anyone have an idea of when this will be finished? We're going the first week of December, hope it will be done!